Opening a restaurant in Hillsboro, Oregon means paying for a lease, building permit work, a build-out, kitchen equipment, opening stock and payroll before the first sale. Quarryfield Capital Group, a small-business funding broker in Hillsboro, Oregon, sets out that order and which funding structures partners consider at each stage. New openings are harder to fund; lending partners make credit decisions.
Eating places across Washington County, OR, by the 2023 count
Washington County, Oregon had 1,346 food service and drinking place employer establishments in 2023, 1,146 of them restaurants and other eating places (County Business Patterns 2023). Only 22.9% of those restaurants had fewer than five employees. In ZIP 97123, around our SE 2nd Ave address, accommodation and food services counted 100 employer establishments, with 35.0% under five employees.
In other words, a new restaurant here usually opens with a real payroll from day one, and that shapes the budget.
Step 1: the lease
Everything else depends on the space. Before signing, find out what the landlord will build or contribute, how long the term runs, and whether you will need building permits for a kitchen, hood, grease interceptor or seating changes. Partners financing the build-out later will want the lease term to outlast the funding.
Step 2: the building permit application
Owners search for Hillsboro building permit applications and permit lookups because almost every restaurant build-out needs plan review and inspections. Permit timing drives the whole schedule: rent often starts before the doors open, so a slow approval means more months of rent with no sales.
Remember that many Hillsboro mailing addresses are outside city limits. Our Hillsboro, OR business license guide explains how to confirm which jurisdiction applies.
Step 3: the build-out
Construction is usually paid in stages as work is completed. Build-out costs cannot easily serve as collateral, so they are typically financed with a term loan or with the owner's own capital. Expect partners to ask for the contractor's estimate and to look closely at how much of your own money is going in.
Step 4: kitchen equipment
Ranges, hoods, refrigeration and dish machines are usually paid on delivery or installation, near the end of the build-out. Equipment financing or a lease lets the equipment secure the deal, which is often the most accessible funding for a new opening. Get an itemized quote that separates hardware from installation.
Step 5: opening stock and the first payroll
Food, beverage and supplies for opening, plus wages for training and the first weeks, all come due before revenue settles into a pattern. Owners often underestimate this stage. Budget at least the first full payroll cycle from reserves, because short-horizon funding is hard to obtain without sales history.
An opening calendar, in order
- Month 0: lease signed, deposit paid, plans drawn for the kitchen and dining room.
- Months 1 to 3: building permit application, plan review and the first construction draws.
- Late build-out: hood, line and refrigeration delivered and installed; inspections scheduled.
- Two to four weeks before opening: opening stock ordered, the crew hired and trained on payroll.
- Opening week: first card deposits arrive, often a few days behind the sales.
The months are illustrative, not a forecast. The point is the order: rent and construction come first, equipment lands late, and payroll starts before a single plate is sold. Funding that starts too early costs money; funding that starts too late leaves a gap right before opening.
What partners consider for a new restaurant
Without sales history, partners look at the owner's restaurant experience, the capital already committed, the lease, and the equipment being bought. Equipment financing is usually the first door to open. A term loan for the build-out may be possible with a strong owner profile; working capital usually waits until there are bank statements to review. Our restaurant financing page covers funding for established restaurants as well.
Licenses and approvals beyond the permit
Food service businesses typically need health and other sector approvals in addition to a city business license and building permits.
Other Washington County notes sit on the blog.